Latest posts
Emmaus Christian College – Primary School Campus
Emmaus Christian College is a growing foundation to year 12 school in South Plympton. When they looked to embark on establishing a new Primary School in Brooklyn Park, TSDB worked alongside the client to assist with new acquisition assessment, master planning and early contractor involvement to assist with planning and costing this new venture. With the establishment […]
Hallett Cove East Primary School
TSDB was engaged to deliver a new single story general learning building and 2 large external shade covers with a combined area of 1600m2 and relocate two existing playgrounds as part of the school’s physical education curriculum and the Building Education Revolution Government school projects. Using a blend of conventional building materials such as contrasting face brickwork, CFC cladding, timber […]
Willunga High School – STEM
Wirreanda Secondary School – STEM
Temple Christian College – Science & Language Building
This project was a two-storey Science and Language Centre including a Resource Facility, Lift, Laboratories, General Learning Areas and central Atrium and was all built on a very tight site. The project also incorporated extensive balconies and installation of a 165,000L rainwater tank for recycling. This was Stage 2 of 4 completed by TSDB as part of the overall […]
Seaview High School – Buildings 2 and 6
TSDB constructed the Stage 2 STEM works upgrade designed by Kirkbride Architects. This upgrade consisted of the construction of 2 separate buildings. Building 2 was a refurbishment of the level 2 Library and Building 6 was the refurbishment of Home Economics and General Learning Area. Building 2 was an internal refurbishment to upgrade the group learning […]
Temple Christian College – Administration
The existing school was operating from small transportable buildings with 1 small single story permanent general learning area building, so the school had outgrown its existing facilities and needed to expand. The main areas of expansion were to add several admin work areas, increase the number of general learning areas and create an effective street presence. The decision to use a red feature panel was […]
Temple Christian College – Performing Arts
This 2-storey building comprises of Music Tuition, Recording Studio, Media Centre, Recital Area, General Learning Areas, Staff room and Computer Suites. This practical building was designed to stand out from the street elevation but blend in with the other existing buildings when viewed from its courtyard elevation. The central Recital Area has become the hub for meetings […]
St Paul Lutheran School
The refurbishment of works was performed throughout the entire school in 4 key stages, with completion dates every term being achieved. This however did have its challenges involved with working in an environment where the school is still in full operation. TSDB had to work closely with the school to achieve tight deadlines and restricted work access. Safety of […]